It can take a week for port delivery. Other grades than the above mentioned such as 304H, 316H, 316Ti, 309S, 310S, 317L, 347, 321, duplex and nickel alloy, it can take longer time roughly two to three weeks to finish production. Have to mention, the above mentioned lead time is estimated as per our manufacturing experience. For accurate feedback, we encourage your confirmation with us to avoid discrepancy. In terms of quality control, our welded pipes & tubes are subjected to X-ray inspection, Hrdro inspection, PMI inspection and others upon your request. The production capacity of stainless steel welded pipe & tube amounts to 1200 tons monthly.
Anti-corrosion (the degree is susceptible to the alloys contained), heat-resistance, good cold and hot working properties, good toughness, good comprehensive performances and wide application.
Industrial application such as petroleum, chemical, paper plant, sewage system, energy, dyeing workshop, mechanical and structural application, boiler heat exchange and others.